D2 - SYSTEM - EXP
Wet rooms under tiles
Adhesive mortar or screed with tiles
Alsan® 410 SYSTEM | |||
---|---|---|---|
3rd layer | |||
2nd layer | |||
1st layer | |||
Primer |
Soprema advices:
Consumption:- Primaire HES: 200g/m2 - Drying time: 12-24hrs
- Alsan® 410 for main surface: 2 coats of 600g/m2 - Drying time: 12-24hrs
- Alsan® 410 on vertical surfaces: 3 coats of 300g/m2 - Drying time: 12-24hrs
- Alsan® 410 sand until saturated: 200g/m2 and silica sand until saturated - Drying time: 72hrs then sweep off
website.guides.summary
- Type of project Wet rooms
- Type of work New
- Substrate Concrete
- Stress level Without insulation
- Finishing Smooth